1. Learn the customer's general requirements.2. Design a complete solution based on the customer's network use requirements, expected quality, and financial budget.3. Learn the operator resources available for the customer's headquarters and all branches.4. Monitor construction of the operator line.5. Complete high-standard line acceptance and subsequent quality maintenance.6. Complete equipment installation and UAT.7. The procedure for building active and standby networks is as follows:n All branches are connected to the backbone POP of NW via the MSTP/SDH circuit, and the flexible, accurate, and secure MPLS technology is used to connect offices and devices located in different areas with each other.n The MPLS traffic engineering technology is used to implement the multi-level QoS assurance for customers' special applications, voice data, and videos.n The redundancy solution is employed. At each access point, dual HSRP routers are connected to the standby backbone VPN of NW through ADSL or other Internet access means, thus implementing the redundancy solution.n The HSRP, PBR, and SLA technologies are used for switching of active and standby lines, making the VPN more reliable, more stable, and more secure.n Hot backup and dynamic protocol are used to implement fiber-connected VPN. When the local loop is disconnected, the services are automatically switched over to the loop protection of the standby line.n The active line (fiber-connected VPN) and the standby line are used concurrently to improve the bandwidth efficiency.n The dual router hot backup solution can deliver high reliability, high security, and maximized return on investment.n NW provides instant response and 24/7/365 comprehensive network system services.